The $68m Bridge Too Far

The $68m Bridge Too Far

Many Marinites and East Bay residents suffer at the hands of acute delays on both 580 and 101 in the evenings caused by the evening backup on the Richmond San Rafael Bridge. The fix is on the way drivers have been told thanks to a $70.3m project set to: add an additional third lane that operates during the evening peak towards Richmond construct a bike path the length of the bridge span Planning for Reality questioned just how this $70.3m was allocated between the additional lane – likely a striping and signage exercise – and the bike path.  Today the Metropolitan Transportation Authority – the Bay Area’s regional transit authority – responded. The $68m Bike Path (was $53m) The breakdown, shown right in MTC’s response is as follows: Bike path: $53m Peak period third car lane: $15m Initial project development costs: $2.3m Not shown – cost to replace bike access path: $15m UPDATE: Note at the bottom of page 12: Please note that the peak period (3rd) lane use may result in the loss of existing bicycle access in Contra Costa County from Pont Molate to Richmond on I-580 shoulder. The estimate cost to replace this access is $15 million and was not included in the $70 million estimate Take a look at those numbers again, now consider the number of people who would benefit from the projects: Cars on 580 peak hour: 6,100 Cars on 101 peak hour: 14,000 Avg #car occupants: 1.13 #hours peak commute: 2 Total people affected: 45,426 According to the latest 2013 Walk Bike Marin bike counts the average Marin bike path has 53...